8500 CHURCH RD
| Application date | Jun 2, 2026 |
|---|---|
| Issue date | Jun 4, 2026 |
| Days to issue | 2 |
| Estimated cost | $10,000 |
| Project type | Alteration |
| Structure type | 34 |
| First seen | 2026-06-06 12:11:58 |
Description
Execute structural floor framing reinforcement and foundation masonry stabilization as detailed in the project blueprint. Major tasks include removing and replacing a failing segment of the main wood beam, setting 7 adjustable heavy-duty steel jack posts, sistering 16 floor joists, and applying polyurethane crack sealant and tuckpointing along the perimeter wall.