5215 N 2ND ST
| Application date | Apr 9, 2026 |
|---|---|
| Issue date | Apr 22, 2026 |
| Days to issue | 13 |
| Estimated cost | $37,000 |
| Project type | Alteration |
| Structure type | 34 |
| First seen | 2026-04-23 14:02:04 |
Description
Interior commercial buildout of an existing office space to create a new conference room. Work includes construction of new non-load-bearing metal stud and gypsum board partitions, associated insulation, ceiling grid and tile modifications, electrical and lighting revisions, HVAC diffuser/return air adjustments, and fire sprinkler modifications to suit the new layout. No structural work is included. Permit review is based solely on attached Drawing Sheet A-1, as no additional drawings or specifications have been provided.