4432 OSCEOLA ST
| Application date | Apr 13, 2026 |
|---|---|
| Issue date | Apr 16, 2026 |
| Days to issue | 3 |
| Estimated cost | $51,000 |
| Project type | Alteration |
| Structure type | 34 |
| First seen | 2026-04-20 16:02:14 |
Description
Kitchen remodel to include flooring, cabinets and countertops. Additional lighting to be added to kitchen include: 4 can lights, 4 pendant lights, dimmer switches and under cabinet lighting. The sink is being moved to the left about 2 feet to go under the existing window. The plumbing to be moved to accommodate the new location.